In a bid to overcome urban waste problems, the government is currently pushing for the accelerated construction of waste-based power plants (Pembangkit Listrik Tenaga Sampah– “ PLTSa ”) through the issuance of Regulation of the President on the Accelerated Construction of Waste-Processing Electrical-Energy Installations Based on Environmentally Friendly Technologies (“ Regulation 35/2018 ”). [1] This same matter was previously addressed under Regulation of the President (“ Regulation 18/2016 ”). However, Regulation 18/2016 was annulled by the Supreme Court, which handed down Decision (“ SC Decision ”) on the following grounds: [2]

Acceleration of the Construction of Environmentally Friendly Waste-Processing Electrical-Energy Installations
Unlock the Full Article
Access the full legal analysis, insights, and linked references with a NOMOS subscription.
In-depth legal interpretation
Related regulations across jurisdictions
Case law references & citations
Downloadable formats (PDF/citations)
Choose Your Plan
Smart. Flexible. Just Right for You.
- Monthly / Yearly options
- Indonesia jurisdiction (More soon)
- For solo users or growing teams
- Enjoy a 7-day free trial on all plans
Already subscribed?
Log in
Need more users or custom pricing?
Latest Analysis