Minister of Energy and Mineral Resources (“Minister”) has issued Regulation No. 19 of 2013 on Purchasing of Electrical Power Sourced By State Electricity Company from Waste-Based Power Plant (“2013Regulation”). The Regulation aims to secure electric supply, and also reducing city waste by encouraging business entity to establish waste-based power plant.

Trading Scheme for Electrical Power Sourced from Waste-Based Power Plant
Unlock the Full Article
Access the full legal analysis, insights, and linked references with a NOMOS subscription.
In-depth legal interpretation
Related regulations across jurisdictions
Case law references & citations
Downloadable formats (PDF/citations)
Choose Your Plan
Smart. Flexible. Just Right for You.
- Monthly / Yearly options
- Indonesia jurisdiction (More soon)
- For solo users or growing teams
- Enjoy a 7-day free trial on all plans
Already subscribed?
Log in
Need more users or custom pricing?
Latest Analysis